EmitScan Asyad Group · Fleet Portal
Ahmed Al-Rashdi · HSE Manager ← Back to website
Total Assets
24
↑ 3 added Q2
Flagged Assets
3
CO / NOx elevated
Next Visit
4 Jul 2026
6 assets scheduled
Scope 1 YTD
412t
CO₂e · 2026

Asset Emissions Registry

IDAsset / SiteSectorLast MeasuredNOxCOSO₂EPA TierStatus
GEN-007
Diesel Gen 500kW
Al Duqm Industrial Zone
O&G
15 May 2026 24817618 T3 ✓ PASS
DRILL-003
Mud Pump Power Unit
Block 6 · Well PDO-447
O&G
12 May 2026 38661224 T2 ⚠ CO HIGH
COMP-011
Gas Compressor Unit
Muscat Processing Facility
O&G
10 May 2026 3022249 T4 ✓ PASS
HAUL-021
100T Haul Truck
Sohar Mining Operations
Mining
08 May 2026 51228038 T2 ⚠ NOx ELEV.
CRANE-007
Mobile Crane 200T
Muscat Bay Project
Construction
06 May 2026 29419811 T3 ✓ PASS
VESSEL-04
MV Oman Falcon · Main Eng.
Port Sultan Qaboos
Maritime
02 May 2026 9.8 g/kWh3120.08%S IMO II ✓ MARPOL
GEN-007 · ASSET HEALTH PASSPORT Visit 3 · 15 May 2026
Diesel Generator — 500 kW
Al Duqm · Caterpillar C18 · 2017 · EPA Tier 3
NOx (NO+NO₂)248 ppmPASS
CO176 ppmPASS
SO₂18 ppmPASS
CxHy (Total HC)92 ppmPASS
O₂ / Excess Air12.4% / 134%NORMAL
Standard: ISO 8178-D2 · WB EHS Guidelines · Benchmark: EPA Tier 3
DRILL-003 · ASSET HEALTH PASSPORT Visit 2 · 12 May 2026
Mud Pump Power Unit
Block 6 · PDO-447 · Detroit Diesel 12V-71 · 2009 · EPA Tier 2
NOx (NO+NO₂)386 ppmPASS
CO612 ppmELEVATED
SO₂24 ppmPASS
CxHy (Total HC)140 ppmPASS
O₂ / Excess Air11.2% / 114%NORMAL
⚠ Elevated CO suggests incomplete combustion. Injector inspection recommended before next operation.
Asset Identification
Auto-generated if left blank
Asset Type & Classification
Auto-assigned from asset category
Site & Location
Fields marked * are required for report generation

Scope 1 Emissions Summary — Asyad Group · H1 2026

Based on EmitScan field measurements across 24 assets. All values are GHG Protocol Tier 3 (direct measurement), not estimated. CO₂e calculated using IPCC AR6 GWP factors.

AssetCategoryFuelCO₂e (t/yr est.)Measurement TierStandardStatus
GEN-007 · Diesel Gen 500kWO&GHSD38.4Tier 3 — MeasuredISO 8178-D2PASS
DRILL-003 · Mud PumpO&GHSD62.1Tier 3 — MeasuredISO 8178-C1ACTION REQ.
COMP-011 · Gas CompressorO&GNat. Gas41.8Tier 3 — MeasuredISO 8178-D2PASS
HAUL-021 · 100T TruckMiningHSD88.6Tier 3 — MeasuredISO 8178-C1MONITOR
CRANE-007 · Mobile CraneConst.HSD29.2Tier 3 — MeasuredISO 8178-C1PASS
VESSEL-04 · MV Oman FalconMaritimeMGO152.4Tier 3 — MeasuredISO 8178-E3MARPOL PASS

Document Library

EmitScan Measurement Report — GEN-007
PDF · 15 May 2026 · ISO 8178-D2
EmitScan Measurement Report — DRILL-003
PDF · 12 May 2026 · ISO 8178-C1 · CO Elevated Flag
Testo 350 Traceable Calibration Certificate
PDF · Apr 2026 · ASTM D6522 · All Sensors
Asyad Group — Scope 1 ESG Data Package H1 2026
XLSX + PDF · GHG Protocol Tier 3 · GRI 305 aligned

Scheduled Visits

UPCOMING — 4 July 2026
Al Duqm Industrial Zone · 6 assets · ISO 8178-D2 + C1
CONFIRMED
COMPLETED — 15 May 2026
Multiple sites · 8 assets measured · All passports issued
COMPLETE